When calibrating and verifying thirty inertial measurement units (IMUs) at the same time, one catastrophic failure can result in a costly retesting of the entire batch. If one bad IMU is allowed to impact all the others, the efficiency of simultaneous testing suffers. As one manufacturer planned its process, it relied on Ideal Aerosmith to make IMU testing as efficient as possible.
How we solved it.